ResinRush™ Field Application Guide

Rapid Ionic Stress-Induced Agarwood Resin Inducer


1. Tree Requirements

ParameterRecommended
SpeciesAquilaria malaccensisA. crassna
Tree Age≥ 5 years
Diameter at Breast Height (DBH)≥ 15 cm
Health ConditionFree of major pests and diseases, vigorous growth

2. Recommended Drilling Pattern (DBH Method)

A. Hole Specifications

  • Depth: 5–8 cm
  • Diameter: 1–2 cm
  • Angle: 45° downward to prevent leakage

B. Spacing

  • Vertical: 10–15 cm between holes
  • Horizontal: Spiral or staggered rows around trunk
  • Number of holes: Adjust according to tree size and age

Visual Reference: Schedule A-1 DBH drilling schematic (spiral pattern around trunk)


3. Dosage and Solution Preparation

A. Solution Preparation

  1. Dilute BarIno™ ResinRush™ in distilled or clean water to recommended concentration:
    • Ferric Chloride (FeCl₃): 1–5% w/v
    • Sodium Chloride (NaCl): 3–10% w/v
  2. Mix until fully dissolved

B. Dosage per Hole

  • 2–5 mL per drilled hole
  • Adjust dosage based on tree size:
    • Small trees: 2 mL
    • Medium trees: 3–4 mL
    • Large trees: 5 mL

C. Sealing

  • Optional: Seal holes with wax or clay to reduce evaporation and prevent contamination

4. Application Procedure

  1. Select healthy trees meeting size and age requirements.
  2. Mark drilling locations in a spiral or staggered pattern.
  3. Drill holes at 45° downward angle, depth 5–8 cm.
  4. Inject BarIno™ ResinRush™ solution using a syringe or drip system.
  5. Seal holes (optional) to protect from rain and pests.
  6. Record treated trees for monitoring and follow-up.

5. Expected Timeline for Resin Formation

Time After ApplicationField Observation
2–4 weeksLocalized tissue browning, initial stress response
1–3 monthsEarly resin accumulation
3–6 monthsNoticeable resin formation around treated holes
6–12 monthsHarvestable resin (low–mid grade)

6. Safety and Handling

  • Wear gloves, goggles, and protective clothing
  • Avoid direct skin contact with ferric chloride
  • Store in a cool, dry, well-ventilated area
  • Rinse equipment thoroughly after use

7. Recommendations for Best Results

  • Avoid oversaturation: Excessive FeCl₃ or NaCl can damage tree tissues
  • Use as part of sequential induction: Combine with BarIno™ FusaPrime™ or FusaTrinity™ for premium resin
  • Monitor environmental conditions: Avoid application during heavy rain
  • Record-keeping: Track treated trees and resin development for quality control

This guide is ready for farmer training manuals or investor SOP handouts, and can be further visualized with DBH drilling schematics and step-by-step diagrams.

I can create a Schedule A-1 DBH schematic visual next, showing the exact spiral/staggered hole placement for rapid field adoption.

Do you want me to create that schematic?